Roof Repair and Overlay at R.M. Levy Water Treatment Plant

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Roof Repair and Overlay at R.M. Levy Water Treatment Plant

Agency:  

California Helix Water District

State:  

California

NAICS Code:  

238160

Industry:  

Construction

Solicitation Type:  

Request for Quotation

Solicitation ID:  

CIP26401

Open Date:  

7/30/2025

Pre-Bid Meeting Date:  

8/12/2025

Questions Due Date:  

8/15/2025

Close Date:  

8/21/2025

Project Duration:  

120 days

Last Updated:  

8/20/2025

Description:
The Helix Water District is seeking a licensed C-39 contractor to perform roof repair and install a silicone roof overlay system at the R.M. Levy Water Treatment Plant. The scope of work includes repairing existing roof blisters, applying a silicone overlay system, and ensuring all work is completed in accordance with the manufacturer's specifications and relevant building codes. The contractor must have at least 7 years of experience in the roofing industry and be registered with the Department of Industrial Relations. • The project requires the removal of approximately 3,000 sq. ft. of blistered foam and the application of a silicone overlay system across approximately 12,000 sq. ft. of roof area. • The contractor must ensure all work is completed within the designated work area and that proper precautions are taken to control debris and overspray. • The final silicone overlay product must be applied per the manufacturer's requirements and include a minimum 20-year warranty covering the entire roofing system for both labor and materials. • The contractor must comply with CAL OSHA requirements and make use of personal fall arrest systems, safety monitors, and safety equipment as required while working around and at skylights, edges, and low parapet walls. • A non-mandatory site visit is highly recommended to inspect and confirm measurements of the surface area needing repair and roof overlay work. • The contractor is responsible for determining the exact quantities of materials needed to complete all components of the work.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Joe Garuba(Facilities Manager)

joe.garuba@helixwater.org

(619) 596-1311

Budget Estimate (AI):

$200,000 – $500,000

Based on the scope of work, which includes the removal of approximately 3,000 sq. ft. of blistered foam and the application of a silicone overlay system across approximately 12,000 sq. ft. of roof area, the estimated budget for this project could range from $200,000 to $500,000. This estimate takes into account the cost of materials, labor, and equipment required for the project, as well as the contractor's overhead and profit. The actual budget may vary depending on the contractor's bid and the District's evaluation of the proposal.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.