BLDG 64 Renovation Niantic, Connecticut
Title:  

BLDG 64 Renovation Niantic, Connecticut

Agency:  

Connecticut Military Department

State:  

Connecticut

NAICS Code:  

236110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

25MIL23801

Open Date:  

1/8/2026

Close Date:  

4/17/2026

Last Updated:  

Description:
The State of Connecticut Military Department is seeking bids for the renovation of Building 64 at Camp Niantic. The project involves removing the existing septic system, providing a new connection to the camp sewer, testing and abatement of hazardous materials, and gut demolition of the interior. The contractor will be responsible for salvaging and relocating a walk-in cooler, insulating the existing envelope, providing new front doors and exterior windows, and modifying the existing siding. The project also includes the installation of new partitions, finishes, lighting, electrical and data distribution, AV equipment, and a new fire alarm system. The estimated total cost of the project is $1,600,000. • The project requires the removal of the existing septic system and connection to the camp sewer. • The contractor must test and abate hazardous materials. • The interior of the building will be gutted, and new finishes will be installed. • The contractor must salvage and relocate a walk-in cooler. • The project includes the installation of new electrical and data distribution systems. • A new fire alarm system will be installed. • The estimated total cost of the project is $1,600,000.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Denisa Dede(Fiscal/Administrative Officer – Purchasing Dept)

MIL.PROJECTS@ct.gov

(959) 258-3504

Budget Estimate (AI):

$1,500,000 – $2,000,000

Based on the estimated total cost of the project, which is $1,600,000, the budget for the contractor could be in the range of $1,500,000 to $2,000,000, depending on the final cost of the project and the contractor's profit margin. The budget could be influenced by factors such as the cost of materials, labor, and equipment, as well as any changes to the project scope or timeline.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.