The Teton County Recycling Center requires a comprehensive fire‑suppression upgrade that includes a new lowered ceiling, draft‑barrier system, dry‑pipe sprinkler zone, larger sprinkler mains, updated riser assemblies, backflow preventer replacement, fire‑alarm panel replacement, new lighting, floor preparation and painting, and full testing, inspection, and commissioning. The work is a single‑prime, lump‑sum contract with a 120‑day construction schedule, and bidders must provide performance and payment bonds, a 5 % bid security, and comply with Wyoming resident‑preference requirements.
• Install lowered ceiling and draft‑barrier in plastics storage area
• Add dedicated dry‑pipe sprinkler zone serving up to 15 ft high storage
• Replace 4‑in. mains with 6‑in. mains for Class I & III commodities
• Upgrade sprinkler risers, backflow preventer, and fire‑alarm panel
• Provide new interior lighting, floor prep, painting, and patching
• Perform all required testing, inspection, and commissioning
• Submit lump‑sum and unit‑price bid; provide 5 % bid security, performance & payment bonds
• Mandatory registration on Public Purchase; pre‑bid conference (voluntary) on Sep 18, 2026; bid deadline Oct 9, 2026.