Description
UCLA is seeking a qualified Broadcast Integrator (along with Curtain/Track and CYC) to complete a $6.8 M renovation of the Acosta Operations Center’s ground floor. The subcontractor will be responsible for demolition, interior build‑out, MEP upgrades, fire‑sprinkler installation, accessibility improvements, full broadcast system equipment supply, integration, testing, and a dedicated fiber‑optic network linking the new center to surrounding athletic venues. The work must comply with UC Fair Wage requirements, California public‑work labor codes, hazardous‑material abatement, and achieve at least LEED‑ID+C certification.
• Scope includes interior demolition, new partitions, finishes, and MEP modifications.
• Provide and integrate broadcast cameras, consoles, editing stations, and related AV equipment; install all broadcast cabling and fiber‑optic links.
• Must hold a C‑10 Electrical or C‑07 Low‑Voltage contractor license and meet UC Fair Wage ($15/hr) and DIR registration requirements.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Filiberto Diaz(Project Manager)
(213) 407-2021