Description
The NYC Department of Environmental Protection is seeking a qualified contractor to provide comprehensive pipe‑wrapping services for multiple wastewater‑resource‑recovery facilities (WRRFs), pump stations, and associated DEP sites across New York City. The work includes surface preparation, sand‑blasting, epoxy primer and wet‑out application, carbon‑fiber reinforcement, top‑coat painting, hydrostatic testing, and final cleanup, all performed on pipe sections operating at ≤ 1,000 psi. The contract is a three‑year, fixed‑price IFB with a renewal option, requiring compliance with prevailing‑wage rules, safety and environmental standards, and a 30 % community‑hiring goal.
• Scope: Labor, materials, equipment, and testing for composite pipe‑wrapping on wastewater infrastructure.
• Location: Numerous DEP facilities city‑wide (WRRFs, pump stations, ancillary sites).
• Requirements: Bid bond or certified check (5 % of bid), insurance, bonds, certifications, and adherence to NYC labor and M/WBE policies.
• Timeline: Pre‑bid conference July 20 2026 (virtual); bid submission by August 12 2026; contract start September 1 2026; performance through August 31 2029.
Attached files
The solicitation documents live at the source — open the bid source above to download them.