Memorial Hospital at Gulfport is seeking a qualified contractor to replace the entire roof assembly on the East Tower of the hospital. This FEMA Hazard Mitigation project requires removal of the existing modified‑bitumen roof system down to the concrete deck, installation of a new modified‑bitumen roofing assembly with tapered insulation, cover board, flashings, edge metal, penetrations, terminations, and waterproofing, as well as ancillary work such as raising rooftop curbs, relocating HVAC units, installing wind‑rated supports, and weather‑proofing penthouse walls and doors. The work must be performed while the hospital remains fully operational, adhering to strict safety, sequencing, and coordination requirements. Bids are to be submitted as a single lump‑sum package, with a performance and payment bond, and liquidated damages of $1,000 per day for delays.
• Scope: Complete roof replacement of East Tower, including structural, mechanical, electrical, and site‑specific modifications.
• Location: Memorial Hospital, Gulfport, MS (Risk Category IV, 185 mph wind design).
• Bid Type: Sealed single‑lump‑sum bid with qualification statements; electronic or hard‑copy submission accepted.
• Pre‑Bid Conference & Site Visit: September 22 2026 (mandatory attendance).
• Submission Deadline: October 8 2026, 2:00 PM (sealed bids).
• Bonds Required: Performance and payment bonds; liquidated damages $1,000/day.
• Evaluation: Contractor must demonstrate ability to work in an operational healthcare environment and comply with Mississippi Certificate of Responsibility requirements.