Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Angelina Road Maintenance at the National Forests and Grasslands at…
More bids in District of Columbia →

U.S. Department Of Agriculture·District of Columbia

Angelina Road Maintenance at the National Forests and Grasslands at Texas

Closes 8/7/2026$500k – $1.5MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The contractor shall furnish all labor, equipment, materials, supervision, and incidentals necessary to perform roadway maintenance, ditch reshaping, mowing, and culvert removal and replacement throughout the southern portion of the Angelina National Forest. The project includes disposal of all removed culverts from Forest Service property. The contractor is responsible for disposing of the original culverts and removing them from the forest. Key aspects of the project include: • Roadway surface maintenance: Surface grading of 94.3 miles of designated Forest Service roads. • Routine vegetation management: Routine mowing of 53.3 miles of roadside vegetation. • Materials to be furnished and installed: 325 tons of crushed limestone. • Quality requirements: All work shall meet Forest Service road maintenance standards and industry best practices. • Safety and environmental requirements: The contractor shall perform all work in a safe, orderly, and environmentally responsible manner consistent with USDA Forest Service policies, applicable federal and state regulations, and industry best practices.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Thomas Tran(Contracting Officer)

[email protected]

Key dates

Opened
7/23/2026
Questions due
7/29/2026
Closes
8/7/2026
Duration
166 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
115310
Solicitation №
12363N26Q4208

Budget estimate

$500,000 – $1,500,000

The estimated budget for this project is between $500,000 and $1,500,000, based on the scope of work and the materials required. The project involves significant roadway maintenance, ditch reshaping, and culvert removal and replacement, which will require substantial labor and equipment costs. Additionally, the contractor will need to dispose of removed culverts and materials, which will add to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.