Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Atlantic Bridge Localized Pavement Repair & Bandini Blvd…

City of Vernon·California

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026$900k – $1MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Vernon is soliciting sealed bids for a comprehensive street‑rehabilitation project on Atlantic Bridge and Bandini Boulevard between Indiana Street and Sunol Drive. The contract covers asphalt grind‑and‑overlay, removal and replacement of concrete curbs, gutters, sidewalks, and driveway approaches, utility adjustments, traffic‑signal cabinet and controller replacement, installation of traffic‑detector loops, and full striping/marking work. The project must be completed within a 70‑day calendar schedule and includes stringent requirements for traffic control, storm‑water BMPs, railroad coordination, and OSHA/CA‑COVID‑19 compliance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carlos Velazquez(Assistant Engineer)

[email protected]

(323) 583-8811

Key dates

Opened
10/19/2026
Pre-bid meeting
10/28/2026Mandatory
Closes
11/17/2026
Duration
70 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2027XXXX

Budget estimate

$900,000 – $1,000,000

The engineer’s estimate places the project value between $900,000 and $1,000,000. Assuming the award will be at or near the high end of the range, the contractor could expect to earn roughly $900 k–$1 M in total contract value, with retainage and performance bonds affecting cash flow but not the total amount.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The City of Anaheim·California

Top match · 83%

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Indianapolis·Indiana

83% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Indianapolis·Indiana

82% match

ST-24-110 2024 Asphalt Street Rehabilitation - Area 2

Closes 10/29/2026Opened 10/16/2026

City of Irving·Texas

82% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

City of Indianapolis·Indiana

82% match

ST-24-110 2024 Asphalt Street Rehabilitation - Area 2

Closes 10/29/2026Opened 10/8/2026

City of Newport Beach·California

82% match

Concrete Replacement Program FY 2026-27 And Hospital Road Sidewalk Improvements

Closes 10/27/2026Opened 10/1/2026

City of Riverside·California

82% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Cincinnati·Ohio

82% match

Traffic Signals Contract No.3

Closes 11/6/2026Opened 10/10/2026

City of Indianapolis·Indiana

82% match

ST-24-110 2024 Asphalt Street Rehabilitation - Area 2

Closes 10/29/2026Opened 10/9/2026

City of Augusta, GA (Augusta Commission)·Georgia

82% match

Greene Street Improvements Project (5th Street to 13th street)

Closes 10/26/2026Opened 9/21/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

81% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Dania Beach·Florida

81% match

Sidewalk Rehabilitation Phase II

Closes 10/26/2026Opened 9/18/2026

City of Hesperia·California

81% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

City of Indianapolis·Indiana

81% match

ST-24-110 2024 Asphalt Street Rehabilitation - Area 2

Closes 10/29/2026Opened 10/17/2026

City of Richmond·California

81% match

Harbour Way and Wright Avenue Safety Improvements - Section 130

Closes 10/29/2026Opened 10/7/2026

City of Rancho Cordova·California

81% match

Bridge Preventative Maintenance Repair At Horn Road

Closes 11/2/2026Opened 10/8/2026

City of Hampton·Virginia

81% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Williamsburg·Virginia

81% match

IFB 08 4101 27 FY27 Citywide Street Resurfacing

Closes 10/27/2026Opened 10/5/2026

City of Albany·Georgia

81% match

Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Murfreesboro·Tennessee

81% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

81% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

LA Public Works Engineering Bureau·California

81% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

81% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

City of Stillwater·Oklahoma

81% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of Cedar Rapids·Iowa

81% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026