Description
The District is procuring six integrated control cabinets (four spillway and two flap‑gate) plus associated position‑sensing instrumentation, wiring, programming, testing, delivery, installation, training, and a spare‑parts package for the Cowlitz Falls Hydroelectric Project. The work includes full UL‑listed fabrication, PLC/HMI integration, factory acceptance testing, site commissioning, and an 18‑month warranty.
• Supply and fabricate UL‑listed, NEMA 4X steel control cabinets with PLC (Allen‑Bradley CompactLogix) and HMI, including heating, lighting, and HVAC.
• Provide Rittmeyer RIPOS Smart encoders and Stromag limit switches, mount, wire, program, and certify them.
• Deliver, install, test, and commission the systems on‑site, provide training, documentation, and spare‑parts, meeting delivery deadlines of 31 Mar 2027 (Phase 1) and 30 Apr 2027 (Phase 2).
Attached files
The solicitation documents live at the source — open the bid source above to download them.