Description
The County is seeking a qualified contractor to design, install, test, and commission a new underground fiber‑optic link serving the new Ashwaubenon Library. The work includes directional‑bore installation of a 2‑in. SDR‑11 HDPE duct (~2,641 ft), construction of two Tier‑22 handholes, pulling a 12‑strand single‑mode fiber cable (≈ 3,775 ft total including building entry), performing up to 12 splices, terminating the cable on a rack‑mounted panel, and completing OTDR/PMLS testing. The contractor must also handle all required permits, utility locating, traffic control, erosion‑control BMPs, and full sidewalk/road restoration for any potholing. The project must start by 13 May 2026 and be finished by 27 May 2026.
• Install new underground duct and handholes via directional boring.
• Pull and splice 12‑strand single‑mode fiber, terminate, and test to meet loss‑budget criteria.
• Provide complete site restoration, erosion control, and documentation (as‑built, test reports).
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
(920) 448-4049