Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Illinois guideIllinois Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Illinois
  4. ›Construction
  5. ›Davis Lodge Roof Replacement & Kitchen Remodel

City of Bloomington·Illinois

Davis Lodge Roof Replacement & Kitchen Remodel

Closes 11/24/2026$150k – $500kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Bloomington is seeking a qualified contractor to replace the roof of the historic Davis Lodge and remodel its kitchen. The project includes a base bid for an architectural asphalt shingle roof, an alternate metal shingle roof option, and a separate kitchen remodel alternate. Work must be performed within a tight 20‑day window in early March 2027, and bidders must attend a mandatory pre‑bid site visit. The contract will be awarded to the lowest responsible and responsive bidder, with performance and payment bonds equal to 100% of the contract price required. <br/>• Scope: Remove existing asphalt shingle roof, install new architectural asphalt shingle roof (base) or metal shingle roof (alternate).<br/>• Alternate #2: Complete kitchen renovation – cabinets, countertops, plumbing fixtures, interior finishes, and related system upgrades.<br/>• Mandatory pre‑bid meeting/site visit on 5 Nov 2026; attendance required.<br/>• Bid submission via OpenGov portal by 24 Nov 2026, 10:00 am CST.<br/>• Project timeline: Construction March 7‑27 2027 (20 days).<br/>• Bonds: 10% bid guarantee; 100% performance & payment bonds after award.<br/>• Compliance: Prevailing wage, project labor agreement, equal opportunity goals, insurance minimums.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brett Lueschen(Procurement Manager)

[email protected]

(309) 434-2439

Key dates

Opened
10/27/2026
Questions due
11/12/2026
Pre-bid meeting
11/5/2026Mandatory
Site visit
11/5/2026Mandatory
Closes
11/24/2026
Projected award
12/14/2026
Duration
20 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
Bid #2027-16

Budget estimate

$150,000 – $500,000

The bid package does not disclose an estimated contract value, but a full roof replacement on a historic lodge plus a complete kitchen remodel typically ranges from $150,000 to $500,000 depending on material choices (architectural vs. metal shingles) and the extent of kitchen finishes. The presence of alternates suggests a base scope likely around $200‑$300 k, with the kitchen remodel adding another $100‑$200 k if selected. Therefore a reasonable budget estimate for the base plus potential alternates is $150,000‑$500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.