Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›47--TEE,TUBE TO BOSS

U.S. Department Of Defense·United States of America

47--TEE,TUBE TO BOSS

Closes 11/13/2026$5k – $20kInvitation for Bid
Get bids like this by emailBid source

Description

This Navy procurement seeks a “TEE, TUBE TO BOSS” fitting manufactured to exact specifications (SSP Fittings Corp P/N S6SRT‑SF). The part must comply with multiple quality and inspection standards (MIL‑STD‑130, MIL‑STD‑1622, ISO‑9001, etc.), be mercury‑free, and be delivered under a fixed‑price contract. The contractor must maintain a certified quality system, submit engineering change proposals for any design modifications, and cooperate with government source inspections. • Provide the specified tee/tube, meeting all listed drawing and material standards. • Maintain ISO‑9001 (or equivalent) quality system and allow government audit of records and equipment. • Deliver within the schedule (final delivery 210 days after certification) and support any required certifications or waivers.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(717) 605-3992

Key dates

Opened
10/15/2026
Closes
11/13/2026

Last updated

Details

Type
Invitation for Bid
Industry
Manufacturing
NAICS
332919
Solicitation №
N0010426QFE41

Budget estimate

$5,000 – $20,000

No contract value is disclosed. Based on typical Navy procurements for a single custom metal fitting, the total award is likely modest—perhaps a few thousand dollars for the part plus overhead. A reasonable estimate ranges from $5,000 for a low‑volume, straightforward order to $20,000 if additional testing, certification, and logistics costs are included.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Maine

Top match · 88%

47--TEE,TUBE TO BOSS

Closes 11/13/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

82% match

STEM, VALVE

Closes 10/28/2026Opened 9/24/2026

U.S. Department Of Defense·Pennsylvania

82% match

CLEANER,PIPELINE,AI

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·Pennsylvania

82% match

61--CABLE ASSEMBLY,SPEC

Closes 10/22/2026Opened 11/26/2025

U.S. Department Of Defense·United States of America

82% match

BODY,VALVE

Closes 11/13/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

82% match

47--TEE,PIPE

Closes 10/18/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

82% match

STUD,CONTINUOUS THR

Closes 10/30/2026Opened 10/16/2026

U.S. Department Of Defense·Pennsylvania

82% match

12--PERISCOPE,TUBE,OUT

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

81% match

48--VALVE,PLUG

Closes 11/9/2026Opened 10/7/2026

U.S. Department Of Defense·Oklahoma

81% match

47--TEE,TUBE TO BOSS

Closes 10/25/2026Opened 10/13/2026

U.S. Department Of Defense·Pennsylvania

81% match

CABLE ASSEMBLY,SPEC

Closes 10/22/2026Opened 11/4/2025

U.S. Department Of Defense·Pennsylvania

81% match

TEE FLARELESS

Closes 10/22/2026Opened 9/17/2026

U.S. Department Of Defense·Pennsylvania

81% match

53--MOLDED INSERT

Closes 10/30/2026Opened 11/25/2025

U.S. Department Of Defense·Pennsylvania

81% match

61--CABLE ASSEMBLY,SPEC

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

81% match

RETAINING NUT

Closes 10/30/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

81% match

VALVE,BALL

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

81% match

CAP,VALVE

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

81% match

48--VALVE,THROTTLE

Closes 11/23/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

81% match

PARTS KIT,SEDIMENT

Closes 10/30/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

81% match

VALVE,BALL

Closes 11/2/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

81% match

47--PIPE, 8IN

Closes 10/22/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

81% match

VALVE, FLOW CONTROL

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

81% match

GASKET

Closes 11/13/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

81% match

48--VALVE,CHECK

Closes 10/26/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

81% match

HOSE,NONMETALLIC

Closes 11/5/2026Opened 10/6/2026