The Wayne County “Genoa Gravity Sewer Rehabilitation – Phase I” project calls for the repair, relocation, and replacement of aging sewer infrastructure in Goldsboro, NC. The work includes trenchless Cured‑In‑Place Pipe (CIPP) rehabilitation of roughly 4,750 linear feet of 6‑18‑inch gravity main, open‑cut relocation of about 610 linear feet of 8‑inch main, rehabilitation of 19 manholes, replacement of 3 manholes, and several ancillary improvements at multiple public‑service sites (Genoa, landfill, schools, highway). Bidders must submit sealed bids by October 13, 2026, after attending a mandatory pre‑bid meeting on September 24, 2026. The anticipated contract value is $2.1‑$3.15 million and will be awarded to the lowest responsive and responsible bidder under a general‑contract (all‑trades) format.
• Scope: CIPP trenchless rehab, open‑cut pipe relocation, manhole rehab/replacement, installation of rail brackets, generators, fall‑protection grating, bar‑screen grinder, vent pipe, bypass connections, and flow meter.
• Location: Goldsboro, North Carolina (Wayne County).
• Bid submission: Sealed bids due Oct 13, 2026, 2:00 PM at Wayne County Courthouse, 224 E Walnut St., 4th floor.
• Pre‑bid meeting: Sep 24, 2026, 11:00 AM – mandatory for prime bidders.
• Bid security: 5 % of bid amount; no withdrawal for 60 days post‑opening.
• Required qualifications: Proper trade licensing, performance and labor‑material bonds, insurance per county requirements.
• Estimated contract value: $2.1 M – $3.15 M.