Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›17--PUMP ASSEMBLY,TRAILER

U.S. Department Of Defense·United States of America

17--PUMP ASSEMBLY,TRAILER

Closes 11/8/2026$6k – $20kRequest for Quotation
Get bids like this by emailBid source

Description

This solicitation seeks quotes for four pump assemblies intended for trailer use, to be delivered to DLA Distribution Cherry Point within 167 days after order. The contract will be awarded to any responsible source that submits a timely electronic quote. No specifications, plans, or drawings are provided, and the solicitation is hosted electronically only. • Quantity: 4 pump assemblies (NSN 1730012168023) • Delivery: DLA Distribution Cherry Point, 167 days ADO • Submission: Electronic quote only, deadline 9 November 2026 • No hard‑copy solicitation; no technical specifications attached • Open to all responsible sources; source must be approved (00994 8960‑M)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
10/28/2026
Closes
11/8/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
336413
Solicitation №
SPE8EF27T0175

Budget estimate

$6,000 – $20,000

The solicitation does not disclose pricing. Based on typical costs for small‑scale pump assemblies (approximately $1,500‑$5,000 each) and the quantity of four units, the total contract value is likely in the range of $6,000 to $20,000. Factors influencing the final amount include the specific pump model, procurement volume discounts, and any ancillary services such as shipping or warranty support.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 88%

17--PUMP,GEAR BOX,HYDRA

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

87% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

86% match

29--PUMP ASSEMBLY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

86% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

86% match

47--HOSE ASSEMBLY,NONME

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

86% match

47--HOSE ASSEMBLY,NONMETAL

Closes 11/10/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

85% match

47--HOSE ASSEMBLY,NONME

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

85% match

43--PUMP,HYDRAULIC

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

85% match

17--TRAILER,GROUND HANDLIN

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

85% match

47--HOSE ASSEMBLY,NONME

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

85% match

29--LEVER ASSEMBLY,FUEL CO

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

85% match

47--HOSE ASSEMBLY,NONMETAL

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

84% match

17--PARTS KIT,HYDRAULIC JA

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

84% match

47--HOSE ASSEMBLY SET,NONM

Closes 11/8/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

84% match

47--TUBE ASSEMBLY SET,META

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

84% match

29--PUMP,COOLING SYSTEM,EN

Closes 11/8/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

84% match

43--PARTS KIT,HYDRAULIC PU

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

84% match

47--HOSE ASSEMBLY,NONME

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·Oklahoma

84% match

29--SEAL ASSEMBLY

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

84% match

29--PUMP,FUEL,METERING AND

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

84% match

47--HOSE ASSEMBLY,NONMETAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

84% match

43--PUMP,ROTARY

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

84% match

43--PUMP,ROTARY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·California

84% match

43--PUMP,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

84% match

47--HOSE ASSEMBLY,NONMETAL

Closes 11/11/2026Opened 10/27/2026