Description
This opportunity involves the full repainting and coating of the North Ohio overpass bridge, including fencing, lighting, concrete barriers, and rail components. The City of Salina requires high‑performance epoxy and fluoropolymer coating systems applied after thorough surface preparation, along with strict environmental and safety compliance. The contract is currently in the bidding phase, with an addendum revising the completion schedule to mid‑late 2027.
• Scope covers high‑pressure water‑blasting, hand‑tool cleaning, and application of specified Tnemec epoxy primers and fluoropolymer finishes on steel, concrete, and railroad rail surfaces.
• Includes unit‑price line items for mobilization, traffic control, containment/disposal of non‑lead paint residues, and the painting work itself.
• Contractor must provide QA/QC documentation, attend a pre‑application meeting with the City, Union Pacific & K&O Railroads, and meet a one‑year post‑completion inspection.
Attached files
The solicitation documents live at the source — open the bid source above to download them.