The VA is conducting market research for a construction contract to renovate unfinished space on the second floor of Building 1 at the Mann‑Grandstaff VA Medical Center in Spokane, WA, creating a new operating‑room suite. The draft Statement of Work describes extensive structural, mechanical, electrical, and plumbing modifications, a new HVAC system, temporary renovations to maintain first‑floor operations, and a 550‑day performance period. Respondents must demonstrate capabilities, bonding capacity ($5‑10 M), and compliance with small‑business and veteran‑owned set‑aside requirements.
• Scope: Renovate ~7,200 sq ft to create three modern operating rooms, relocate lab space, replace HVAC unit, and perform structural upgrades.
• Requirements: Provide full labor, materials, supervision, one‑year warranty, Legionella flushing protocol, and field verification; demonstrate bonding of $5‑10 M and relevant past performance.
• Submission: Email response (≤ 5 pages) to Brenda Bigelow by 19 Oct 2026 12 pm PT; include contact info, business‑size classification, capabilities statement, estimated project duration, and past performance (up to three contracts).