The project involves a comprehensive refurbishment of the Beaver Ruin Diversion Pump Station’s mechanical, civil, and electrical systems. Three existing grinder units, multiple influent and effluent slide‑gate assemblies, and associated concrete structures will be removed and replaced with new equipment, while electrical conduit and a motor‑control center are to be installed. The work must be completed within 450 days of contract award.
• Replace three grinder units, rail systems, and control panels.
• Replace three influent slide‑gate actuators, three effluent slide gates, two influent wet‑well slide gates, and one wet‑well crossover slide gate.
• Raise concrete wet‑well baffle walls and platforms, relocate flushing system, and install new electrical conduit and MCC configuration.