Description
The City of Rapid City is seeking bids for the reconstruction of approximately 600 feet of road on South Street from Block 17 Alley to West Boulevard, including the replacement/extension of water main and storm sewer, and the construction of ADA ramps. The project includes the reconstruction of 350 feet of street patch on 11th Street from Fulton Street to South Street. The estimated cost of the project is $1,270,000.00. The successful bidder will be required to provide a surety bond and liability insurance.
• The project includes the replacement/extension of approximately 1,250 linear feet of water main and 450 linear feet of storm sewer.
• The project includes the construction of ADA ramps at the 11th Street and South Street intersection.
• The project is located in Ward 5.
• The project requires the contractor to obtain all applicable permits associated with the project.
• The project requires the contractor to maintain minimum insurance coverages, including liability insurance and workers' compensation insurance.
• The project requires the contractor to provide a surety bond in an amount equal to the total cost of the project.
• The project requires the contractor to comply with all applicable laws and regulations, including those related to employment, labor, and environmental protection.
Attached files
The solicitation documents live at the source — open the bid source above to download them.