Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Closed bids
  5. ›RFQ Mill Creek Bridge #1 Replacement Project

Cowlitz County·Washington

RFQ Mill Creek Bridge #1 Replacement Project

Closes 8/27/2026$2M – $5MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Cowlitz County Department of Public Works is seeking a consultant to provide civil, geotechnical, environmental, and structural engineering design services for the Mill Creek Bridge #1 replacement project. The project involves replacing the existing bridge with a new 36-foot-wide bridge that spans Mill Creek, including bank restoration and road approach reconstruction. The consultant will be responsible for preparing design plans, specifications, and estimates, as well as obtaining necessary permits. The project is expected to begin in 2029 and will have a duration of approximately 36 months. • The consultant will provide civil, geotechnical, environmental, and structural engineering design services. • The project includes replacing the existing bridge with a new bridge that is 36 feet wide and spans Mill Creek. • The consultant will be responsible for preparing design plans, specifications, and estimates. • The project includes bank restoration of Mill Creek in the vicinity of the bridge and reconstruction of the road approaches the bridge. • The County will provide the topographic survey, boilerplate specifications, and pavement section. • The County will be responsible for developing right of way plans, obtaining appraisals, and negotiating for easement acquisition and for project bidding and award.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Andrews(Contact Person)

[email protected]

(360) 577-3030

Key dates

Opened
7/8/2026
Closes
8/27/2026
Projected award
10/14/2026
Duration
36 months

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
BRS-A084(002)

Budget estimate

$2,000,000 – $5,000,000

The budget for this project can be estimated based on the scope of work and the duration of the project. The project involves replacing a bridge, which is a significant infrastructure project. The cost of such a project can range from $1 million to $10 million, depending on the complexity of the project and the materials used. Since the project has federal funds from the Federal Highway Administration’s Highway Bridge Program Surface Transportation Block Grant Program, the budget is likely to be on the higher side. Considering the duration of the project (36 months) and the scope of work, a reasonable estimate for the budget would be between $2 million and $5 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.