The City of Charlotte is issuing an upcoming solicitation for a series of six storm‑drainage improvement projects (Series AJ) across multiple city locations. The work includes replacement and realignment of reinforced concrete pipes ranging from 15‑ to 36‑inch diameters (including elliptical pipes), installation of CIPP liners, replacement of drainage structures, construction of non‑standard endwalls, full‑depth asphalt, curb and gutter, concrete driveways, foundation assessment and protection, boulder toe, soil lifts, and water‑main replacement. The contract will require the vendor to maintain various insurance coverages and provide bid, payment, and performance bonds. Estimated total contract value is between $500,000 and $999,999, with the term lasting through project completion.
• Six distinct site locations (Lombardy Circle, Teddington Drive, Kilborne Drive, Moss Mill Lane, Norwood Drive, Kerry Glen Lane).
• Scope covers pipe replacement, CIPP lining, structural upgrades, roadwork, and utility relocations.
• Mandatory bonding and insurance requirements (bid, payment, performance bonds; general liability, workers’ comp, auto, etc.).
• Estimated contract value $500k–$1M; project duration defined as “through completion” rather than a fixed calendar period.