Description
The City of Providence is seeking professional structural engineering consultation services for the evaluation of existing conditions at the Jospeh A. Doorley Municipal Building. The evaluation will be high-level, focusing on the overall condition of visible building elements. The scope of work includes assessing the general condition of the building, but excludes inaccessible areas. Key considerations for this project include the building's size (approximately 56,000 square feet), age (constructed in 1967), and materials (brick veneer façade). The City is also providing notice of intent to use special procurement for a land lease to support salt storage for the Department of Public Works.
• The building is a three-story municipal office building.
• The evaluation will be limited to visible areas without the need to remove coverings or components.
• Inaccessible areas are not included in the evaluation.
• The land lease is for approximately 20,000 square feet, located at 30 Shipyard Street.
• The lease rate is $0.30 per square foot per month.
• The lease term is 6 months, beginning 11/1/2025 and ending 4/30/2026.
Attached files
The solicitation documents live at the source — open the bid source above to download them.