Description
The Town of Westerly is seeking bid proposals from qualified contractors to design and construct floodproofing measures to protect the Margin Street pump station from potential 100-year flood waters. The project includes floodproofing the wet well, pump vault, and two sanitary sewer manholes, and may involve sealing pipe penetrations and structure joints, waterproofing electrical panels, and installing waterproof access hatches and modular waterproof barriers. The contractor will be responsible for designing, permitting, and constructing the floodproofing measures, as well as coordinating with the Town's WWTF operator and mitigating the impact on roadways, driveways, and sidewalks. The project is funded by a federal grant and is subject to various federal and state regulations, including those related to prevailing wage rates, equal employment opportunity, and environmental protection.
Key aspects of the project include:
• Design and construction of floodproofing measures for the pump station and associated infrastructure
• Coordination with the Town's WWTF operator and other stakeholders
• Compliance with federal and state regulations, including those related to prevailing wage rates and equal employment opportunity
• Mitigation of the impact on roadways, driveways, and sidewalks
• Provision of all necessary materials, equipment, and labor for the project
Attached files
The solicitation documents live at the source — open the bid source above to download them.