Description
The City of Dalton, Georgia is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. The project is expected to last approximately 496 days, with a planned delivery date of November 26, 2027.
• The project requires the design and fabrication of electrical equipment for a new power generation plant.
• The scope includes medium-voltage and low-voltage switchgear lineups, as well as engineering submittals and field services.
• The project has a planned delivery date of November 26, 2027.
• The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner.
Attached files
The solicitation documents live at the source — open the bid source above to download them.