Durham Public Schools is seeking qualified contractors to remove existing boilers, pumps, vent pipes and associated equipment at Southern High School (800 Clayton Rd, Durham, NC 27703) and Neal Middle School (201 Baptist Rd, Durham, NC 27704), and to install new gas‑fired condensing boilers, pumps, piping, vents, insulation, and related accessories. The scope also includes removal of a domestic water‑heater vent pipe, replacement of a 2‑section panelboard with a single‑section unit, extension and reconnection of panelboard feeders and pump circuits, installation of new boiler circuits, and integration of carbon‑monoxide alarms with the fire alarm control panel. Work must comply with all applicable building codes, safety standards, and Durham Public Schools’ procurement policies. Proposals are due in sealed hard‑copy form (three copies) plus one electronic copy on a flash drive by 1:00 pm on 13 Oct 2026. The contract will have an initial term of one year with optional two‑year extensions.
• Remove existing boiler systems and associated venting at two school sites.
• Install new gas‑fired condensing boilers, pumps, piping, insulation, and venting.
• Upgrade electrical panelboard and related circuits.
• Provide carbon‑monoxide alarm integration.
• Deliver, install, test, and commission all equipment; provide required documentation and warranties.
• Must meet all federal, state, and local regulations; vendor must be financially stable and possess relevant experience.