Description
The Kansas City Board of Public Utilities is seeking proposals for the construction and installation of two 2,500KW diesel fueled engine-generators and a new paralleling electrical switchgear at the Nearman Water Treatment Plant. The project requires the removal of existing equipment and the installation of new equipment, with the proposer responsible for all labor, equipment, and materials necessary for the installation. The project will be worked in two phases due to current lead times of electrical equipment.
Key aspects of the project include:
• Installation of two 2,500KW diesel fueled engine-generators
• Installation of a new paralleling electrical switchgear
• Removal of existing equipment
• Responsibility for all labor, equipment, and materials necessary for the installation
• Phased project due to lead times of electrical equipment
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Jacquelyn Bagby(Procurement Contract Coordinator)