Description
The project involves replacing a section of the Blanchard Springs Recreation Area sewer collection system. The work includes directionally drilling pressure sewer lines under North Sylamore Creek and replacing or lining gravity lines. Additionally, there are option items for rehabilitating two pressure lift stations. The goal is to improve the system's functionality, eliminate deferred maintenance, and increase resiliency to extreme weather and flood events.
• The project is located in the Ozark St. Francis National Forest.
• The sewer line replacement will prevent freezing and damage from floating debris.
• The project includes option items for rehabilitation of two pressure lift stations.
• The solicitation is posted on SAM.gov, and RFI responses will be posted as amendments.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
James Edington