The project calls for the complete modernization of the steam system at Elmhurst Hospital Center, including removal of existing equipment, installation of a new condensate tank, clean‑steam generator, and suction tank, as well as extensive mechanical, electrical, plumbing, and data‑cabling upgrades. The work must comply with stringent hospital‑environment regulations, including asbestos abatement, hazardous‑material handling, and a mandatory Project Labor Agreement (PLA). The contractor must provide all labor, materials, permits, and certifications, and complete the project within a 280‑day schedule after notice to proceed.
• Replace existing steam‑driven pumps, surge tank, and associated piping with new FRP surge tank, 10 000‑gal domestic‑water suction tank, and a Spirax‑Sarco clean‑steam generator.
• Install new stainless‑steel (316 L) medium‑pressure steam piping, update electrical service panels, BMS integration, and full data‑cabling (Cat‑6) infrastructure.
• Conduct comprehensive asbestos, lead, PCB, and hazardous‑waste abatement, with required permits, negative‑pressure dust containment, fire‑watch, and certified safety plans.