Description
The City of Tustin is seeking bids for the Main Street Well 3 & Newport Well 3 Improvements Project. The project involves the rehabilitation of two wells, including the removal and replacement of existing pumps and motors, as well as the installation of new electrical and control systems. The project also includes the performance of various tests and inspections to ensure the wells are functioning properly. The contractor will be required to provide all necessary labor, materials, and equipment to complete the project.
• The project includes the rehabilitation of Main Street Well 3 and Newport Well 3
• The contractor will be required to perform pre-removal testing and document existing pump and motor operating conditions
• The contractor will be required to remove, transport, inspect, test, and evaluate the existing pump and motor
• The contractor will be required to perform downhole video inspection and submit well-condition assessment reports
• The contractor will be required to rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City
• The contractor will be required to perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, and post-rehabilitation inspection where required