This solicitation calls for the removal of an existing 80 kW standby generator at the WYDOT Burgess Junction facility and the supply, installation, and commissioning of a new 100 kW Generac SG100 industrial generator, including all electrical, propane, exhaust, and mounting work. The contractor must provide all labor, materials, permits, testing, and coordination, ensure compliance with NEC, OSHA, and Wyoming state codes, and deliver warranty documentation and operator manuals. A mandatory pre‑bid inspection and conference on 28 Oct 2026 at the site is required. Bids are submitted electronically via Public Purchase, with a closing deadline of 10 Nov 2026.
• Remove and dispose of existing 80 kW generator.
• Supply and install a new 100 kW Generac SG100 (LP‑fuel, three‑phase, sound‑attenuated enclosure).
• Perform all electrical, grounding, LP‑gas, and exhaust connections; integrate with existing ATS.
• Provide start‑up testing, commissioning reports, and two sets of manuals.
• Comply with NEC, OSHA, state electrical and fire inspections, and utility requirements.
• Coordinate scheduling with WYDOT (one‑week notice required).
• Warranty documentation and post‑installation support required.