This formal Invitation for Bids (IFB) seeks a qualified contractor to construct a three‑lane roadway on Vance Jackson (Loop 410 to Adrian Drive) funded by a 2022 bond. The scope includes demolition, grading, backfill, utility installation, new traffic signals, sidewalks, curbs, driveways, milling, resurfacing, striping, and associated water, sewer, and storm‑drain work. The total contract value is approximately $8.1 million. Bids are submitted electronically via CivCast; hard copies are not accepted. A non‑mandatory pre‑bid WebEx conference will be held on 14 Oct 2026, and questions are due by 20 Oct 2026. The bid deadline is 3 Nov 2026 at 2 PM CT, with award date not yet posted.
• Project location: San Antonio, TX (Loop 410 to Adrian Drive)
• Contract type: Invitation for Bid – construction of roadway, utilities, traffic signals, sidewalks, and related infrastructure
• Estimated budget: $8.1 M
• Key dates: Bidding opens 02 Oct 2026, pre‑bid meeting 14 Oct 2026, questions due 20 Oct 2026, bid deadline 03 Nov 2026
• Required deliverables: Design‑build construction, utility installation, signal installation, pavement work, striping, curb‑and‑gutter, sidewalk/handicap ramp construction
• Mandatory submission format: Electronic via CivCast (no hard copies)
• Primary contact: Melissa Ortega, City of San Antonio Procurement (210) 207‑6015,
[email protected]