The State of Alaska’s Department of Natural Resources has issued a Regional Manager’s Decision authorizing a private, non‑exclusive easement to GPG Alaska Resources Inc. for a 25‑year term. The easement covers approximately 11.2 acres of state‑owned upland near Glacier Highway, 21 mi northwest of Juneau, and provides a 15‑ft wide, 1.3‑mile unpaved access road plus two 1‑acre staging areas to support mineral exploration on adjacent USFS land. Development is split into two phases: Phase 1 (0.17 mi road segment and first staging area) is authorized immediately; Phase 2 (remaining 1.13 mi road and second staging area) requires a USFS Plan of Operations approval. Construction will involve standard earth‑moving equipment, shot‑rock roadbed, culverts, fencing, security cameras, and seasonal snow‑plowing. Environmental reviews addressed fish habitat, wildlife, spill prevention, and waste disposal. The decision became effective on 8 Aug 2026, with a 20‑day appeal window.
• Easement term: 25 years (with 5‑year Entry Authorization)
• Road: 15 ft wide, unpaved, 1.3 mi total length
• Staging areas: two 1‑acre sites, fenced, with containers and security systems
• Construction equipment: bulldozer, excavator, loader/skid‑steer, dump trucks, optional grader
• Environmental conditions: 300‑ft buffer from anadromous streams, spill containment for up to 330 gal diesel, etc.
• No public bidding or submission deadline; this is a land‑use authorization, not a procurement.