Description
The City of Lewiston is seeking bids for the Central Avenue Road Rehabilitation project. The work includes installation of pipes, catch basins, and pavement, as well as stripping, shimming, and repaving the existing road. The scope also includes installing curbing and paved sidewalks on the easterly and westerly sides of the road, replacing two seasonal water services, and removing and replacing the existing stormdrain infrastructure.
• Installation of 404 LF 6” SDR35 PVC Perf Pipe
• Installation of 230 LF 12” SDR35 PVC Solid Pipe
• Installation of 2,040 LF 12” SDR35 PVC Perf. Pipe
• Installation of 15 EA 4’ Dia. Catch Basin, Frame, Grate
• Installation of 1,650 Ton, Machine-Placed 19.5mm HMA
• Installation of 550 Ton, Machine-Placed 12.5mm HMA
• Installation of 250 Ton, Hand-Placed Pavement
• Installation of 1,100 CY Aggregate Base (Roads, Sidewalks, Driveways)
• Installation of 2,900 LF Slipform Concrete Curbing