The City of Santa Monica is seeking a qualified contractor to design, construct, and install multiple sewer laterals and associated beach restroom facilities along the Palisades Beach corridor. The work includes mobilization, trenching, pipe installation, water‑fountain lateral, concrete/asphalt site restoration, traffic control, testing, and final close‑out. The contract is valued at approximately $700,000 and must be completed within 180 calendar days. Bidders must hold a Class B California contractor license, provide performance and labor‑and‑material bonds for 100 % of the contract sum, and comply with prevailing‑wage, living‑wage, and Oaks Initiative requirements. All submissions are electronic via OpenGov, with a non‑mandatory pre‑bid meeting on November 4, 2026.
• Scope: Install sewer laterals (Lateral 11, 12, 16, 17, 25) and a water‑fountain lateral, plus associated restroom structures.
• Estimated budget: $700,000; contract duration 180 days.
• Mandatory licensing: California Class B, DIR registration, prevailing‑wage compliance.
• Bonds required: 100 % performance and labor‑and‑material bonds.
• Key dates: Release Oct 14 2026, Pre‑bid Nov 4 2026, Questions Nov 13 2026, Bid due Nov 20 2026 (5 PM).
• Delivery: Electronic bid submission via OpenGov; post‑award contract execution within 10 days.