Description
The City of Naperville is seeking bids for the Northwest Waterworks Improvements Phase III project. A mandatory pre-bid meeting will be held on November 18, 2025, at 1:00 p.m. in the Conference Room at 1200 W. Ogden Ave, Naperville, Illinois. The meeting will be followed by a site visit. Bidders must send a representative to attend the pre-bid meeting in-person and supply their own Personal Protective Gear for any walk-through.
• The project involves water supply and sewage treatment equipment maintenance and repair.
• The project requires engineering consulting services, including civil engineering, mechanical engineering, and structural engineering.
• The project involves construction services, including pipeline construction and water system construction.
• The project requires maintenance and repair services for water systems, main and service lines.
• The project involves the design and installation of valves, directional control, to control pneumatic, hydraulic, or water cylinders.
Attached files
The solicitation documents live at the source — open the bid source above to download them.