Description
The Alabama Department of Environmental Management is seeking a contractor to relocate a 20‑ft shipping container and its roof platform from the agency’s Mobile Field Office to a city‑owned concrete pad near John Kidd Park. The work includes loading, transporting, unloading, and installing the platform on the container, with the option to provide a forklift or crane if needed. The vendor must indicate availability and will be favored if the move can be completed by the end of August.
• Move a 20 × 8 × 8 ft container and 14 × 8 ft roof platform.
• Load, transport, unload, and install the platform on the container at a specified city site.
• Provide required equipment (forklift/crane) and supply an availability date; preference for completion by Aug 28 2026.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Chris Harris(Site Contact)
(251) 450-3400