Description
The City of Pueblo is seeking a qualified contractor to construct a multi‑use, ADA‑compliant trail (Westside Trail) along Wildhorse Creek between 18th and 24th Streets. The scope includes grading, drainage, removal of existing pavement and vegetation, installation of concrete and riprap trail sections, safety railings, drainage structures, signage, and optional solar lighting. The project is partially funded by a CDOT grant and must comply with federal, state, and local construction, safety, and environmental regulations. The contract requires at least 30 % self‑performance and a 180‑day completion window from the Notice to Proceed. Bids are submitted electronically; a non‑mandatory pre‑bid meeting is scheduled.
• Location: Pueblo, CO – Wildhorse Creek corridor (18th St to 24th St)
• Contract type: Public Improvement Invitation for Bid (IFB)
• Estimated contract value: roughly $3‑7 million (based on line‑item quantities)
• Key deliverables: grading & drainage, trail surface (concrete or crusher‑fines), handrails, inlet protection, signage, optional solar lighting, site restoration
• Mandatory requirements: 30 % self‑performance, SAM.gov registration, CDOT “additional insured” coverage, affirmative‑action plan, compliance with Buy‑America, safety & environmental statutes
• Timeline: Release 9/1/26 → Pre‑bid 9/9/26 → Questions 9/15/26 → Bid opening 9/23/26 → Notice to Proceed → 180 days to finish.
Attached files
The solicitation documents live at the source — open the bid source above to download them.