Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harriso…
More bids in Alabama →

U.S. Department Of Defense·Alabama

Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)

Closes 7/9/2026$10M – $50MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Deer Island Ecosystem Restoration project involves constructing the initial phase of the restoration, specifically restoring the extension of the rock breakwater structure known as Katrina Key. The project requires the placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850's dimensions. The contractor must comply with Cybersecurity Maturity Model Certification (CMMC) requirements and have a current CMMC status at the CMMC Level 1 (Self) for all information systems used in performance of the contract. Key aspects of the project include: • Construction of a 12,000 feet rock breakwater structure • Placement of armor layer stone or bioengineered reef • Geocomposite placement • Compliance with CMMC requirements • Processing, storing, or transmitting Federal Contract Information (FCI) or Controlled Unclassified Information (CUI)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Paul Adamo(Contract Specialist)

[email protected]

Key dates

Opened
3/12/2026
Closes
7/9/2026
Duration
480 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W9127826RA046

Budget estimate

$10,000,000 – $50,000,000

The budget for this project can be estimated based on the scope of work, which includes the construction of a 12,000 feet rock breakwater structure. The cost of such a project can vary depending on factors such as the type of materials used, labor costs, and equipment rental fees. However, a rough estimate for a project of this scale could be between $10 million to $50 million, considering the costs of materials, labor, and equipment. The actual budget may be higher or lower, depending on the specifics of the project and the bidding process.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Maryland

Top match · 74%

Mid-Bay James Island Restoration Phase 2

Closes 10/22/2026Opened 10/7/2026

U.S. Forest Service·United States of America

68% match

Great Lakes Restoration Initiative: Community Forest and Open Space Conservation Program

Closes 12/8/2026Opened 7/22/2026

U.S. Department Of Defense·Illinois

67% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

U.S. Department Of Defense·Mississippi

66% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

Mobile County·Alabama

65% match

DAUPHIN ISLAND CAUSEWAY SHORELINE RESTORATION: PHASE 3

Closes 10/21/2026Opened 1/1/2017

James City County·Virginia

65% match

Landing Circle Stream Restoration

Closes 10/28/2026Opened 9/23/2026

U.S. Department Of Defense·California

64% match

Grand Island Mitigation Site

Closes 10/27/2026Opened 10/8/2026

U.S. Department Of Defense·Nebraska

64% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

James City County·Virginia

64% match

Landing Circle Stream Restoration

Closes 10/21/2026Opened 9/23/2026

Kentucky Department of Fish & Wildlife Resources·Kentucky

64% match

FW-002-27 - FILO - Red Oak Phase II

Closes 10/29/2026Opened 9/21/2026

Public Service Commission·Wisconsin

63% match

Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

Mississippi

63% match

Dredging of Bayous Near Gulf Coast Research Lab and Eagles Nest, Ocean Springs, MS

Closes 10/14/2026Opened 9/30/2026

Maryland Talbot County Government·Maryland

63% match

26-18 BALL FIELD RENOVATIONS - TALBOT COUNTY COMMUITY CENTER

Closes 10/22/2026Opened 9/25/2026

U.S. Dept. of Treasury RESTORE Act Program·United States of America

63% match

RESTORE Act Direct Component ? Construction and Real Property Acquisition Activities

Closes 10/31/2026Opened 9/26/2024

Florida Fish and Wildlife Conservation Commission (FWC)·Florida

63% match

Telogia Creek Site Prep for Restoration

Closes 10/19/2026Opened 9/24/2026

California Grants·California

63% match

Forest Conservation

Rolling / TBD closeOpened 6/18/2025

Neel-Schaffer, Inc·Mississippi

63% match

20464.000 SAP-23(14)M Roads "A" - "B"#20953

Closes 10/19/2026Opened 10/9/2026

City of Madison - Purchasing Services·Wisconsin

63% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/3/2026Opened 10/6/2026

Illinois Natural Resources·Illinois

63% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

Florida Fish and Wildlife Conservation Commission (FWC)·Florida

63% match

Dinner Island Ranch WMA Canal Cleaning and Maintenance

Closes 10/16/2026Opened 9/18/2026

Virginia Department of Wildlife Resources·Virginia

63% match

Hydrologic and Geomorphic Analysis at Coastal Forest WMA Tract 38

Closes 10/19/2026Opened 9/25/2026

Maryland Charles County Government·Maryland

63% match

ITB 27-009 NPDES Oak Ridge Park East Stream Restoration

Closes 10/20/2026Opened 9/18/2026

City of Madison - Purchasing Services·Wisconsin

63% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/2/2026Opened 9/29/2026

U.S. Dept. of Treasury RESTORE Act Program·United States of America

63% match

RESTORE Act Direct Component - Non-Construction Activities

Closes 10/31/2026Opened 9/26/2024

Maryland Transportation Authority·Maryland

63% match

SHORELINE RESTORATION AT FSK POLICE HEADQUARTERS

Closes 10/20/2026Opened 8/4/2026