The Town of Clayton is soliciting competitive bids for the design‑build construction of a new Fire Station #2 Public Works Building. The scope includes a pole‑barn style structure with foundations, framing, roofing, siding, minor site grading, electrical and plumbing installations, and the provision of two 9,000‑gallon cistern tanks with all associated piping and commissioning. The project is expected to take approximately 120 days from start to substantial completion, and all bids must be submitted by October 21, 2026.
• Location: 800 NC‑42, Clayton, NC 27527 (Fire Station #2 site)
• Contract type: Fixed‑price construction under Town of Clayton’s Modified EJCDC C‑111 specifications
• Required work: foundations, structural framing, roof, siding, site grading, drainage, electrical, plumbing, water storage cisterns
• Pre‑bid conference (non‑mandatory): October 1, 2026, 10:30 am at the fire station site
• Questions due: October 9, 2026 (5 pm EST) – submit via designated website
• Bid submission deadline: October 21, 2026, 10:30 am (Town Hall, 111 E Second St., Clayton, NC)
• Anticipated construction duration: 120 days to substantial completion
• Required qualifications: General construction contractor with experience in institutional/pole‑barn projects, capable of handling electrical, plumbing, and large‑cistern installations.