Description
The City of Stillwater is seeking bids for the installation of a Baggage Handling System at the Stillwater Regional Airport New Terminal Building. The system includes inbound and outbound baggage handling, with multiple powered conveyors, roller conveyors, liftgate, security doors, and impact protection. The contractor will be responsible for installing and programming the system, as well as coordinating with the Construction Manager at Risk (CMAR) and the Transportation Security Administration (TSA) for integration with the Explosive Detection System (EDS) machine. Key features of the project include:
• Installation of a Baggage Handling System
• Inbound and outbound baggage handling
• Multiple powered conveyors, roller conveyors, liftgate, security doors, and impact protection
• Coordination with CMAR and TSA for EDS integration
• Compliance with FAA standards and regulations
The contractor will be required to submit a bid that includes all necessary documentation, including a guarantee in the form of an acceptable bidder's bond, and performance, maintenance, and statutory bonds. The contract will be awarded based on the lowest responsive bid, and the contractor will be required to complete the work within the specified timeframe.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
John McClenny