The City of Northglenn is seeking a qualified contractor to remove, rehabilitate, and replace hot‑mix asphalt pavements across multiple city streets, a community‑center corridor, and a municipal parking lot, including associated concrete work such as sidewalks, curb ramps, curbs, and gutters. The project requires full‑depth asphalt removal, milling, base preparation, placement of new hot‑mix asphalt (including options for 20 % RAP), concrete reconstruction, traffic and erosion control, and comprehensive material testing by an independent laboratory. The contract will be awarded to the lowest responsive and responsible bidder, with performance and payment bonds, and includes optional one‑year extensions subject to budget. The work must be completed within a strict schedule, with liquidated damages of $4,500 per day for delays.
• Scope covers demolition and replacement of asphalt mats, concrete sidewalks, curbs, gutters, and curb‑ramps across three distinct zones (Local Streets, Community Center Drive, M&O Parking Lot).
• Required services include mobilization, erosion control, traffic control, materials sampling, testing, and inspection, plus compliance with Colorado “Keep‑Colorado‑Labor” requirements if the project exceeds $500 k.
• The contract includes a Notice to Proceed on 28 May 2027 and a substantial‑completion deadline of 28 Jun 2027, with potential liquidated‑damage penalties for schedule overruns.