The City of Watertown is seeking bids for the construction of an Airport Terminal Solar Array at the Watertown Regional Airport. The project includes the installation of a solar farm on carport structures of the Terminal Parking Lot, modifications to the existing electrical distribution system, and other related construction work. Bidders must comply with all applicable Federal Labor Laws and maintain an affirmative action program. The successful bidder will be required to provide a certified check, cashier's check, or draft in the amount of 5% of the total bid, and separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc.
• The project requires the installation of a solar farm on carport structures of the Terminal Parking Lot.
• Modifications to the existing electrical distribution system of the Terminal to accommodate the solar farm production.
• Other related construction work, including mobilization, traffic control, removal and disposal of asphalt surfacing, asphalt trench repair, and inlet protection.
• The successful bidder must comply with all applicable Federal Labor Laws, including minimum wage rates.
• The successful bidder must maintain an affirmative action program.
• The project requires separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc.