Description
The Riverside Community College District is seeking a qualified contractor to provide comprehensive operation, maintenance, monitoring, and performance‑guarantee services for its district‑wide solar photovoltaic (PV) and battery energy storage system (BESS) portfolio. The contract covers five campus sites totaling approximately 6,942 kW DC of solar capacity and 5,979 kWh of storage. The contractor must perform preventive and corrective maintenance, module cleaning, vegetation management, continuous remote monitoring, and produce annual performance reports. The base contract term is five years with up to four one‑year renewal options, and a 10 % bid bond is required.
• O&M scope includes all PV modules, inverters, wiring, grounding, and BESS equipment.
• Mandatory pre‑bid conference on 26 May 2026; electronic Q&A closes 8 June 2026.
• Full bid submission deadline 29 June 2026, with contract start 1 Sept 2026.
• Contractor must hold a California B‑class General Building license with a C‑46 subcontractor classification and meet prevailing‑wage requirements.
Attached files
The solicitation documents live at the source — open the bid source above to download them.