The City of Port St. Lucie is seeking qualified contractors to supply fully assembled, low‑head effluent vortex impeller sewage pumps for its Step System wastewater infrastructure. The contract is a three‑year agreement with two optional one‑year renewals, and the City will purchase pumps on an as‑needed basis. Bidders must provide pumps that meet detailed performance, material, and electrical specifications (e.g., ½ HP, 115 V, 70 gpm flow, 35 ft shut‑off head) and deliver them ready for immediate installation. The solicitation includes strict “cone of silence” communication rules, mandatory insurance, and bonding requirements.
• Supply fully assembled, ready‑to‑install sewage ejector pumps (Champion CPWH5‑13 or equivalent).
• Meet specific construction material standards (cast‑iron housing, stainless‑steel shaft, etc.).
• Electrical specs: single‑phase 115 V, 30‑ft power cord, ½ HP motor.
• Performance: 70 gpm flow, 35 ft shut‑off head, 32‑120 °F operating temperature.
• Delivery on standard pallets, fully wrapped, damage‑free.
• Contract term: 3 calendar years with two 1‑year renewal options.
• Mandatory insurance, bid bond/e‑bond, and adherence to City’s “cone of silence.”
• Submission via OpenGov portal; questions due Sept 21, 2026; bid deadline Oct 5, 2026, 3:00 pm.
• No site visit or mandatory pre‑bid conference indicated.