Description
The City of Louisburg is seeking a qualified consultant to perform a 2026 Wastewater Treatment Plant (WWTP) Antidegradation Study. The study will develop a conceptual plan for the plant site, assess current and future capacity needs, evaluate expansion options to meet future permit requirements, and deliver a cost‑analysis‑driven recommendation that balances community affordability with regulatory compliance. All work must be completed by the end of 2026, with deliverables submitted no later than the bid deadline.
• Develop a conceptual master plan for the WWTP, including current conditions and future growth scenarios.
• Evaluate expansion or upgrade options, perform cost‑benefit analyses, and recommend the most feasible improvement level.
• Provide a full antidegradation study report that satisfies state and federal environmental regulations, ready for City approval.
• Deliver all drawings, calculations, and supporting documentation in accordance with the bid specifications.
• Coordinate with the City’s Public Works Director for any clarifications and adhere to the stipulated timeline (submission by Aug 11 2026, work completed by Dec 31 2026).
Attached files
The solicitation documents live at the source — open the bid source above to download them.