Description
The NASA White Sands Test Facility is soliciting bids for a term contract to collect, remove, and recycle DEMIL A mixed metals scrap, including iron and steel scrap. The annual estimated quantity is approximately 130 tons. The contractor will be required to perform a mandatory pre-bid site inspection and submit bids with specific documentation, including Appendix A and Standard Form 114. The contract will be awarded based on pricing, with a performance guarantee of $6,000.00.
• Mandatory pre-bid site inspection required
• Performance guarantee of $6,000.00
• Pricing based on a percentage of a published market index
• Insurance documentation required prior to performance
• All amendments must be acknowledged
• Failure to comply with solicitation requirements may result in a bid being deemed non-responsive
Attached files
The solicitation documents live at the source — open the bid source above to download them.