The Town of Holly Springs is seeking qualified contractors to construct approximately 1,200 feet of new sidewalk on the east side of North Main Street between Trellis Pointe Drive and Arbor Creek Drive. The scope includes clearing and grubbing, earthwork, removal of existing soil and rock, installation of a roadside ditch and guardrail, cast‑in‑place concrete sidewalks, pavement markings, storm‑drainage connections, utility work, erosion control, and construction traffic control. Bidders must be licensed in North Carolina, provide a 5 % bid bond or certified check, and be prepared to furnish performance and payment bonds (100 % of the contract price) if awarded. The contract will be awarded to the lowest responsive and responsible bidder; all questions are due Sept 17, 2026, a mandatory pre‑bid conference is on Sept 14, 2026, and bids are due Oct 1, 2026 at 2:00 pm.
• Length: ~1,200 ft sidewalk
• Required licenses and bonds (5 % bid bond, 100 % performance/payment bonds)
• Mandatory pre‑bid conference (Sept 14)
• Bid submission deadline (Oct 1, 2026)
• Project includes earthwork, concrete, drainage, guardrail, and markings
• Contractor must handle all sub‑contractor approvals and comply with local, state, and federal regulations.