This opportunity is for the full replacement of two structurally deficient bridges on Mill Street in Southbridge, MA – one spanning McKinstry Brook (S‑21‑009) and the other spanning the Quinebaug River (S‑21‑003). The contract includes demolition of existing superstructures, construction of new steel‑girder bridges with concrete decks, extensive utility relocation, environmental mitigation, and associated roadway, sidewalk, and drainage work. The project is funded at an estimated total of $9.14 million and will be awarded to a contractor pre‑qualified in the bridge‑construction category, with all bids submitted electronically.
• Scope: Bridge demolition, new bridge erection, sub‑structure (abutments, wing‑walls), utility relocation (water, sewer, gas, electric, telecom), environmental mitigation (wetland permits, invasive‑plant control, water‑quality certification), traffic control and temporary works.
• Requirements: SBPP eligibility, pre‑qualification (R109), 5 % bid bond, Buy America compliance, prevailing‑wage adherence, minority and women participation goals, and extensive documentation (plans, specifications, special provisions).
• Schedule: Bids due 10/20/2026 PM; work to commence after Notice‑to‑Proceed; construction period anticipated to be 12‑18 months.