This solicitation seeks a qualified contractor to design and construct a new dialysis space within the Queens Hospital campus of NYC Health + Hospitals. The work includes full demolition of existing interior conditions, structural steel framing, concrete, masonry, interior finishes, and complete MEP (mechanical, electrical, plumbing, fireâsuppression) systems, all performed in an occupied healthcare facility with strict infectionâcontrol, dustâcontrol, and prevailingâwage requirements. The contract will be awarded on a competitive sealedâbid basis, with a mandatory preâbid meeting, a mandatory RFI deadline, and a firm bid submission deadline in November 2026. The project must meet a 30 % M/WBE utilization goal and adhere to NYC H+Hâs Project Labor Agreement, insurance, bonding, and safety standards.
⢠Full interior buildâout of a dialysis training center, including structural steel, concrete, masonry, finishes, and all trades.
⢠Complete MEP installation (HVAC, plumbing, fireâsprinkler, electrical, fireâalarm) with commissioning and electronicâsecurity integration.
⢠Mandatory preâbid meetings (Sept 30 & Oct 1 2026) and strict RFI deadline (Oct 8 2026).
⢠Requires 10 % bid bond, performance & payment bonds, 30 % M/WBE utilization, NAICâadmitted insurance, and compliance with NYC prevailingâwage schedules.
⢠Project duration is 548 consecutive calendar days from NoticeâtoâProceed; budget anticipated in the multiâmillionâdollar range.