Description
The project involves retrofitting the existing bridge rail system on Gaston Road (Bridge #23952) by installing a new Rectangular Tube Retrofit system in accordance with ODOT Standard Drawings. The work includes maintaining temporary traffic control and pedestrian access, installing new retrofit bridge rail components, anchors, coatings, and associated hardware, and performing all additional and incidental work required by the Standard Specifications, Special Provisions, Typical Drawings, and Plans. The project requires strict compliance with environmental protection measures, including in-water work restrictions, pollution control, wildlife protection, and Clean Air Construction diesel equipment requirements.
• The project has a substantial completion date of November 30, 2026.
• The estimated expense for this contract is $110,000.
• Bidders must be registered with the Oregon Construction Contractors Board prior to submitting bids.
• The project is subject to the Clean Air Construction requirements, and bidders must register their equipment and vehicles in The Yard, the CAC equipment registration and compliance portal.
Attached files
The solicitation documents live at the source — open the bid source above to download them.