Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Mississippi
  4. ›Closed bids
  5. ›PRV #26-600-34-99 - 2026 Dredging Operations

Pearl River Valley Water Supply District·Mississippi

PRV #26-600-34-99 - 2026 Dredging Operations

Closes 7/29/2026$1M – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pearl River Valley Water Supply District is seeking qualified contractors to perform dredging operations at the Barnett Reservoir in 2026. The work includes mobilizing equipment, dredging designated channels to specified depths, monitoring and disposing of removed material, conducting post‑dredge bathymetric surveys, and demobilizing equipment. Approximately 36,400 cubic yards of in‑place sediment will be removed across project sites in Rankin and Madison Counties. Bidders must be certified under Mississippi law, provide a bid bond, and adhere to all contract specifications. A pre‑bid meeting is scheduled for July 21, 2026, with a site walk‑through following the meeting. The bid deadline is July 29, 2026 at 11:00 AM CDT. • Mobilization, dredging, disposal monitoring, and demobilization for ~36,400 cubic yds of sediment. • Required Mississippi Contractor’s Certificate of Responsibility and bid bond. • Pre‑bid meeting + site visit on July 21, 2026; bids due July 29, 2026. • Project located at Barnett Reservoir, Brandon, MS (Rankin & Madison Counties). • Full contract documents available for download (15.8 MB PDF).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Adam Choate(Executive Director)

Key dates

Opened
6/30/2026
Pre-bid meeting
7/21/2026
Closes
7/29/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237990
Solicitation №
PRV #26-600-34-99

Budget estimate

$1,000,000 – $2,000,000

Based on typical dredging costs of $30‑$50 per cubic yard, removing 36,400 cubic yards would likely generate contract values between roughly $1.1 million and $1.8 million. Accounting for mobilization, disposal, survey, and profit margins, a reasonable estimate ranges from $1 million to $2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Virginia

Top match · 76%

Winter Harbor Maintenance Dredging

Closes 10/22/2026Opened 9/24/2026

U.S. Department Of Defense·Alabama

76% match

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel

Closes 10/13/2026Opened 9/11/2026

U.S. Department Of Defense·Louisiana

75% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/3/2026

City and County of San Francisco·California

75% match

EXT REC | CON26-0001 Marina Dredging - SF First

Closes 12/31/2026Opened 11/24/2025

U.S. Department Of Defense·Florida

75% match

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel

Closes 10/13/2026Opened 9/29/2026

U.S. Department Of Defense·Washington

75% match

FY26 Willapa Harbor Maintenance Dredging

Closes 11/5/2028Opened 10/17/2025

U.S. Department Of Defense·Virginia

75% match

Quinby Creek Maintenance Dredging

Closes 10/22/2026Opened 9/24/2026

Sarasota County·Florida

75% match

Phillippi Creek Phase II Maximum Allowable Dredging

Closes 10/28/2026Opened 9/25/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Pennsylvania

74% match

RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY

Closes 1/15/2027Opened 10/9/2026

U.S. Department Of Defense·Louisiana

74% match

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Closes 3/31/2027Opened 10/5/2026

U.S. Department Of Defense·Texas

74% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 9/30/2026

U.S. Department Of Defense·Texas

74% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 8/31/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

City of Virginia Beach·Virginia

74% match

ARIQCC for Mechanical Dredging and Maintenance of Navigable Waterways and Channels

Closes 11/12/2026Opened 9/23/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

City and County of San Francisco·California

73% match

EXT REC | CON27-0001 Marina Dredging - RFQ SFFirst

Closes 12/31/2026Opened 7/14/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 4-2026 (OM26004)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

73% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Virginia

73% match

Craney Island Rehandling Basin Dredging

Closes 10/22/2026Opened 9/24/2026